
Stop Subcontractor Rework Before It Starts
A practical, field-tested guide to achieving first-time quality on live construction projects without slowing down your jobsite.
Most construction defects are predictable. Most rework is avoidable.
Yet the same issues appear on job after job because quality systems fail where it matters most with subcontractors and field teams.
This guide shows how leading teams prevent defects before they happen, using clear expectations, repeatable inspections, and buy-in from the people doing the work.
Rework isn’t caused by a lack of standards. It’s caused by inconsistent execution.
On most projects:
The cost isn’t just rework, it’s:
First-time quality isn’t a slogan. It’s a system problem and systems can be fixed.
What’s inside the guide
Inside the guide, you’ll learn:
No theory.
No buzzwords.
No “quality theatre.”
Just practical methods that work on active jobsites.
Privacy Policy © 2019 FTQ360 Inc